 SITE PREPARATION  
 
    
 
Excavation
  1. Foundation soil shall be excavated as required for  footing dimensions shown on the construction drawings.
  2. Excavate for the base.
  3. Level the excavation. A level base will insure  complete contact of each retaining wall unit with the leveling  pad material.
Base Preparation and Material
  1. Base materials should be to the depth and widths shown  in the construction drawing with a minimum of 24" wide  and 6" deep. For below grade placement of Classic units  or Legend units use a ratio 1" below grade for each 8" of  wall kept above grade.
  2. Granular inorganic material should be used for the base  pad (see Foundation Terms).
    Note: do not use pea rock or rounded aggregate for base  pad material.
  3. Level the base material so that gaps will not  develop between any of the units.
  4. Base material should be compacted so as to provide a  level hard surface on which to place the first course of units.  Compaction by a mechanical plate compactor must be  done to 95% proctor.
  5. Check if level using a transit or a level. Use fine sand  for minor adjustments.
  6. Contractor may opt for using a reduced depth of  base material and substitute a 1" to 2" concrete topping.  Concrete shall be lean and unreinforced.